-
ADD Add basic documentation to ReadTheDocs (#114).
-
ADD ability to move working directory (#45).
-
ADD schema that automatically validates configuration files (#45).
-
ADD automatic download of hydro basins data (#34).
-
ADD minimal configuration to be able to test the entire workflow more quickly (#60).
-
ADD installation of
curl
andunzip
from conda-forge, to increase portability (#59). -
ADD sync infrastructure to easily send and receive files to and from a cluster (#74).
-
ADD optional email notifications whenever builds fail or succeed (#92).
-
UPDATE ENTSOE national electricity load data gap filling priority order included in config (#42)
-
UPDATE IRENA hydro generation data from 2018 to 2020 (#40).
-
UPDATE Make scaling pumped hydro capacity according to Geth et al. (2015) optional with a boolean config parameter
scale-phs-according-to-geth-et-al
which defaults to False (no scaling) (#49). -
UPDATE JRC hydro database v4 -> v7 (#48). This entails one patch being removed:
- Romanian PHS data is no longer manually added from Geth et al. (2015).
-
UPDATE Improve gap-filling method for national electricity load data (#3).
-
UPDATE dependencies (#44):
- Python 3.7 -> 3.8
- atlite -> 0.2.1
- geo packages from gdal 2.4 -> 3.2.1
- Updates to NumPy, Pandas, xarray, and others
First public release.