-
Notifications
You must be signed in to change notification settings - Fork 10
/
Copy pathORNL-2658.txt
990 lines (516 loc) · 17.1 KB
/
ORNL-2658.txt
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
e ety e — i 1 . e St . 1
»
5
Contract No, W=7405-eng-26
REACTOR PROJECTS DIVISION
MEASUREMENTS THROUGH A HOT CELL WINDOW
USING OPTICAL TOOLING
A. A. Abbatiello
DATE ISSUED
APR 2 3 1958
.. OAK RIDGE NATIONAL LABORATORY
o Ock Ridge, Tennessee
operated by
UNION CARBIDE CORPORATION
for the
U.5. ATOMIC ENERGY COMMISSION
ORNL-2658
vy
1
MEASUREMENTS THROUGH A HOT CELL WINDOW USING OPTICAL TOOLING!
A. A, Abbatiello
ABSTRACT
.
Optical tooling was evaluated for the measurement of physical dimensions of radicactive parts
through hot cell windows. Instruments were set up outside a 4-ft-thick lead-gloss window. Al-
though the window was not specially selected, the readings were within 1.0% of the true dimension.
Use of a calibration chart of the window variations reduced the error to 10.1%. The method is
considered feasible and sufficiently fast for @ wide range of hot cell measurements.,
of the window's measurement qualities.
The reflections of a point light source from the lead-glass laminae form @ convenient indicator }
INTRODUCTION
The dimensional measurement of irradiated parts
has become one of the problems connected with
reactor development, These measurements are
important to determine strain, creep, and metal-
lurgical changes in parts which have become radio-
active and therefore inaccessible to ordinary
measuring tools. A number of measurement methods .
have been considered, one of which is optical
tooling working through hot cell windows. The
principal advantages of this system are: (1) parts .
may be measured without direct contact or con-
tamination, (2) convenient and comfortable working
areas can be utilized, (3) the cell interior is
entirely free for useful working space, and (4) ac-
ceptable accuracy "is attainable. Essentially,
optical tooling is measurement by means of o
telescope (called a transit square) which is capable
of moving in horizontal “and vertical directions
(Fig. ‘1). It is referenced from an independent
optical control line and may be aligned with the
object point located in space, Direct recdings
taken from a vernier scale mounted on the carriage
are subtracted to obtain the net distance between
two points. In the cases where measurements are
made through windows, a calibration - factor for .
optical distortion is then applied to obtain a cor-
rect reuding.'."Optifi:dl"tooli‘hg? has been in use in
‘Prepared for the 7th Hot Cell Conference.
2
W. L. Egy, ‘‘Optical Toeoling,'” The Tool Engr.
(April 1955). ¢
aircraft plants for years and is now being applied
in other industries requiring accurate location of
widely separated points, as on large assembly
iigs, heavy machinery fabrication, and shipbuilding.
The purpose of this test was to determine the
feasibility of taking accurate measurements with
an optical tooling system through a 4-ft-thick lead-
glass window. The locations and the effect on
the readings of optical defects in the window were
desired as well as the time required to take typical
measurements,
Optical tooling instruments were set up in front
of a new 4-ft-thick hot cell window. Although this
window was selected mainly because it was avail-
able, its optical properties proved adequate for
an acceptable range of accuracy. By calibrating a
specific window, the accuracy can be further in-
creased by applying the correction factors which
are determined by test. '
DESCRIPTION
Measurement by the use of optical tooling re-
quires that the points on the object to be measured
be visible in o direction perpendicular to the win-
~dow syrface thrb(:gh which it is viewed, and that
it be possible to turn the object so that the points
lie in a plane paraliel to the window. A cell
_gfiuipped with a lift and turntable would be most
useful for the larger parts which would be en-
countered in a typical reactor program, Smaller
parts might be adequately handied by manipulators,
or merely set up in front of the window aend prop-
erly oriented.
- ALIGNMENT TELEsc07
TOOLING BAR
TO OBTAIN DIMENSION "X" TAXE TWO VERNIER READINGS AND SUBTRACT.
UNCLASSIFIED
ORNL-LR-DWG 34274
Fig. 1. Optical Tooling Principles.
In order to provide the necessary range of meas-
urement, a transit-type instrument is held in a
plumb position and perpendicular to the window
surface, as shown in Fig. 2. Mechanical means
are provided to move the instrument in horizontal
and vertical directions to cover the complete
window area. An alignment scope generates a
reference line to which the 20-power transit scope
is set perpendicularly at the vertical plane and
elevation of interest.
- An,obticclly flat mirror, magnetically held on a
steel optical flat mounted on the wall at the side
of the window, provides the vertical reference
‘plane. from which the transit square and alignment
scope are positioned. This system is used to
establish a horizontal plane at each new elevation .
(see Fig, 2).
Fundamental Steps of Alignment
The following describes the basic steps in
setting up this optical tooling system:
1. The tooling bar is positioned parallel to the
front of the hot cell window in a convenient loca-
tion. The transit scope and alignment scope are
set respectively 90° from and parallel to the win-
dow (Fig. 2). .
2. The optically flat mirror mounting bar (straight-
edge) is placed in a vertical position beside the:
window and adjusted parallel with its front surface,
The optical mirror is held magnetically to the
optical flat, - | o
3. The transit scope is aligned perpendicular to
the plane of the optical flat {Fig. 3).
4, Without disturbing the previous setup, the’
alignment scope is positioned from the fransit -
*
C
.y
STEEL OPTICAL
T
ALIGNMENT
TELESCOPE
TOOLING BAR
VERTICAL
SCALE
._ : : a ,
N Yo/ ot ceLt
UNCLASSIFIED
ORNL-LR-DWG 34275
WINDOW
PRECISION
LEVEL
LEVELING
. ELEVATING
GEAR
Fig. 2. Onficdl Tooling for Hot Cell Test.
- scope and udiusted to bring it square by means 'of -
the built-in transit scope mirror, thus providing a
fixed reference line parallel to the front of the
~window. This - control reference line is- ‘then
available for cll subsequent mecsurements at thuf, o
" level, : ' :
5, The transn square is moved to the flrst
position and aligned (Fig. 4).
6. The transit square is aligned with the part
(Fig. 5) and the vernier is read,
7. The transit square is moved to the second
posmon, allgned and read,
;8._,,A_; change to unother elevation is made by
repositioning the magnetically mounted wall mirror
B '(Fig'.' 2) along the steel optical flat, and repeating
- the - perpendicular setting of the transit scope to
this mirror. The alignment scope is then raised
and positioned from the transit scope, thus estab-
lishing a new reference line in a plane parallel to
Fig. 3. Tronsit Square Is Set with Opiicu"y Fliat Reference Surfuée.
UNCLASSIFIED
PHOTQ 414763
Fig. 4. Transit Square Is Adjusted Perpendicular to the Alignment Scopg.
o
UNCL ASSIFIED
PHOTO 41764
«
Fig. 5. Truns!t Square Is Aligned
with Grid Plate.
UNCLASSIFIED
PHOTO 41765
"
the front of the window, and at the elevation de-
sired for the new set of measurements.
Equipment Requii‘é& L
Commercially available optical tooling equip-
ment was set up for evaluation under practical hot
cell conditions. Vertical measurement was impro-
vised using a vertical height gage and a precision
level (Fig. 6). In a typical hot cell envisioned,
the test arrangement would be replaced with a
combination tooling bar as sketched in Fig. 2,
The purpose of the combination tooling bar is to
provide easier manipulation in the vertical plane
than is available with the standard tooling bar. It
has been estimated that the combination tooling
bar and all the associated equipment for one com-
plete setup would cost about $6000,
GENERAL PROCEDURE
System evaluation was done by setting up the
instruments at the hot cell window and taking -
readings of an accurately scribed plate at three
locations: (1) outside the cell, (2) with the plate
hung just inside the cell (to determine the wedge
displacement of the window), and (3) repeating the
readings with the plate at the most distant (about
9 f1) portion of the cell, to get the maximum angular
deviation, '
Typical Example of Measuring a Part
- A cylinder was placed in the cell ot a point
about 5 ft back from the cell window, and the
diameter was recorded using. the optical tooling
instruments, Table 1 shows a first and a second
try, with the cylinder moved to o new position for
the second test in order to view through a different
portion of the window. The cylinder was 6,800 +
0,002 .in.,-in diameter and had @ shiny surface,
which was not considered the ideal for best accu-
racy, but was used as an example of practical
system evaluation, A view of a part inside the
cell is shown in Fig. 7,
DISCUSSION
Although the instruments may appear complex,
they were surprisingly easy to operate, During
the calibration of the cell window, the complete
cycle of raising the tooling bar, precise leveling,
squaring with the optical wall mirror, taking 18
sets of readings on the horizontal scale using the
transit square, and also toking 18 corresponding
points vertically with the optical micrometer attach-
ment were made in about 1 hr. Operators were
trained rapidly in the use of these instruments,
During the course of this test, four different
assistonts were used, some for as little as one
day, and each was able to learn the technique and
The reproducibility of the results was determined
by taking a set of readings along the same hori-
zontal line on three different occasions when the
instruments had been removed and replaced. These
data, plotted in Fig. 8, show a dispersion of about
0.030 in, for length measurements of 20 to 30 in.,
which indicates a reproducibility of about 10.1%.
- Further improvement probably could be obtained
by using a more permanent setup with refinements
-such as floor plates having dowel bushings
mounted in the floor. This would have the added
advantage of making it easy to remove the instry-
“ments” for use at other installations, or to free
" Table 1. Measurement of a Cylinder
: :Fir'st Try Second Try
Right side of cylinder, vernier reading, in. .~ 48.959 44.488
" Left side of cylinder, vernier reading, in. 42,160 | 37.664
. ,Differqnce{ '(éylindér ;Vlii',.nm;eter zfilllc'ortect'ed.), in, 7 6.799 6.824
' _B-eéd-’.a:.s'q.-.:th'i..r_;_'obiec'f'w,u."_srot' 5 ft, _u#@‘/z -cdrr_ecfiqn : -0.022 | —0.018
- (from a Vf_ub'le_pr‘epoired‘.for this winde);-_ i_h; : ’ :
Cdrriec'féd_dirarhe‘tér, )i'rrs. | 6777 | 6.806
Accuracy
6.777/6.800 = 99.7% 6.800/6.806 = 99.9%
UNCLASSIFIED
PHOTO 41862
'Fig. 6. Data Taken Using Vernier Height Gage, Precision Level, and Optical Micrometer,
S 5 | PHOTO 41864
'Fig. 7. Measurement of a Part Inside Cell.
NOTE:
UNCLASSIFIED
ORNL~-LR-DWG 34276
THE INSTRUMENTS HAD BEEN REMOVED AND REPLACED EACH DAY
GRID PLATE WAS 9ft 9in. BACK OF CELL WINDOW
2 0.250 , —
w o . ‘ B 2
© 0.200 |
Z A OCT 4. A/??
o O OCT 7. A .
u b
w 0450 I~ ¢ ocT 9 -
a
w ‘ ‘ —
> 0.100
> 0.050 ==
2 0.
3
| o Az . |
o a 8 12 16 . 20 24 28 32
DISTANCE ALONG WINDOW AT LOWEST VISIBLE LINE (in.)
Fig. 8. Window'Calib_rution.‘
the window when other work is in progress, Work-
ing area may be provided directly .in front of the
window without interfering with the optical tooling,
since the distance over which the instruments
operate may -be increased considerably without
appreciable loss of accuracy. A permanently
mounted optical flat at the side of the window
would aid in maintaining a common reference plane
as the basic starting point.
No special effort was made to use a selected
window; the one tested merely happened to be
available, and therefore high optical accuracy was
not expected. It is of interest to note that a pin-
point light source revealed noticeable variations,
although the window is of acceptable accuracy.
If all laminae have parallel surfaces and are
assembled into a paraliel pack, the light-source
images would lie in o straight line when viewed
from any position. The use of a simple light
source appears useful as an aid when assembling
windows, because the alignment of each lamina
could be checked easily as it is being placed. .~
SUMMARY
1. The method proposed for linear measurements
through hot cell windows is considered feasible on
10
the basis of the equipment and methods used in a
hot cell test at ORNL, Views of the components
in use are shown in Figs. 3, 4, and 5,
2. The accuracy of measurements taken through
this particular window without correction is about
99% and 99.87% respectively for readings taken
93/4 ft and 6 in. inside the cell window.
3. By using the calibration chart produced for
this window during the test (Fig. 8), accuracy can
be improved to about 99.9% (or 10.1% variation)
- for long cell distances, which approaches the
practical accuracy of routine shop measurements
in non-radioactive work using conventional methods,
As the work is brought closer to the window,
errors are proportionately reduced. |
4., The speed and accuracy of taking measure-
ments is high for hot cell work. It may be com-
pared to typical experience using a cathetometer
or a sutface plate and vernier height gage.
5. A pin-point light reflection test is a simple
method to evaluate a window for potential accu-
racy, and might be developed further to assist the
manufacturer in selectively assembling glass
sections for best precision, '
6. A zinc bromide or other liquid-filled window,
having the minimum humber of light-refracting sur-
faces, would be preferred for measuring purposes.
C
-}
el
“Since optical tooling is used perpendicular to the
viewing surface, chromatic aberration is not a
problem. Because of the lower density of zinc
bromide, however, greater thickness would be
necessary to obtain equivalent shielding.
7. Operators can be rapidly trained in the use
of these instruments,
8. Hot cells planned for accurate parts meas-
urements could use this measuring system by
calibrating a window or selecting one with suit-
able properties.
ACKNOWLEDGMENTS
The assistance of W. W. Alto, Chief Engineer
of the Brunson Instrument Company, is acknowl-
edged for the contribution of the idea of an opti-
cally flat reference surface from which to align
the transit scope for different elevations. A. N.
Brunson, President of the Brunson {nstrument
Company, Kansas City, Missouri, provided the
instruments which were loaned for this test,
The assistance of R. J. DeBakker in setting up
the equipment is acknowledged, as well as the
cooperation of D. E. Ferguson and C, P. Johnston
for the use of the cell. Credit is also due to
T. E. Crabtree, H. W. Hoover, C. K. McGlothlan,
and J. J. Platz for help in operating the equipment
and taking daota,
The complete review of this report and the many
helpful comments of D. B. Trauger are gratefully
acknowledged; also, the assistance and encourage-
ment of M. Bender, W. F. Boudreau, and F. R.
McQuilkin are appreciated.
1
INTERNAL DISTRIBUTION
- 1. C. E. Center 67.
2. Biology Library 68.
. 3. Health Physics Library 9.
4-5. Central Research Library 70.
6. Reactor Experimental 71.
Engineering Library 72.
- 7=26. Laboratory Records Department 73.
27. Laboratory Records, ORNL R.C. 74.
28. A. M. Weinberg 75.
29. L. B. Emlet (K-25) 76.
30. J. P. Murray (Y-12) 77.
31. J. A. Swartout 78.
32-36. A. A. Abbatiello 79.
37. S. E. Beall 80.
38. M. Bender 81.
39. D. S. Billington 82.
40. E. P. Blizard 83.
41. A.L.Boch 84.
42, C. J. Borkowski 85.
43. W. F. Boudreau 86.
44. G. E. Boyd 87.
45. E. J. Breeding 88.
46. R. B. Briggs 89.
47. W. E. Browning 90.
48. R. S. Carlsmith 9.
49. R. A, Charpie . 92,
50. R. Clark 93.
51. W. B. Cotirell 94.
52. G. A. Cristy 95.
- 53. F. L. Culler 9.
54. R. J. DeBakker 97.
. 55. S. E. Dismuke R
¢ 56. H. G. Duggan 99.
57. D.E. Ferguson . 100.
58. W. F. Ferguson g 101.-
59. A. P. Fraas 102,
60. E. A. Franco-Ferreira - 103,
61. E. J. Frederick 104.
' 62.- J. H Frye, Jr. 105.
63. W.R. Grimes 106,
64. E.Guth - 107,
65. C.S. Harrill - 108.
-
66, W. R. Harwell
109.
EX TERNAL DIS TRIBUTION
110. Dmsmn of Resecrrch und Deve |opment, AEC ORO
1”-633. Given distribution as shown in TID-4500 (14th ed.) under Instruments category
H.
A.
A,
C.
w.
G.
C.
M.
J.
R.
R.
M.
H.
W.
E.
J.
F.
A.
K.
G.
M.
A.
P.
A.
E.
P.
F.
A
H
A
H
R
E
0.
M.
A.
E.
D.
C.
G.
ORNL.2658
Instruments
TiD-4500 (14th ed.)
W. Hoffman
Hollaender
S. Householder
P. Johnston
. Jordan
. Keilholtz
. Keim
. Kelley
. Lane
. Lindaver
Livingston
Lundin
. MacPhetson
. Manly
R. Mann
R. McNally
R. McQuilkin
J. Miller
Z, Morgan
Morris
L. Nelson
R. Olsen
Patriarca
M. Perry
E. Pierce
M. Reyling
Ring, Jr.
DO wpP—4 V=T
. F. Rupp
. W. Savage
. W. Savolainen
. E. Seagren
. P. Shields
. D. Shipley
Sisman
J. Skinner
H. Snell
H. Taylor -
B. Trauger
D. Watson
D. Whitman -
G. C. Williams -
C. E. Vinters -
ORNL ~ Y-12 Technical Library,
Document Reference Section