Update hypre #115
Triggered via pull request
January 17, 2024 00:17
Status
Cancelled
Total duration
39m 18s
Artifacts
–
docker_build_tpls.yml
on: pull_request
Matrix: build_images
check_that_all_images_built
0s
Annotations
22 errors
Ubuntu (20.04, gcc 9.3.0, open-mpi 4.0.3)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Ubuntu (20.04, gcc 9.3.0, open-mpi 4.0.3)
The operation was canceled.
|
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Ubuntu (22.04, gcc 12.3.0, open-mpi 4.1.2)
The operation was canceled.
|
Pecan CPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Pecan CPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5)
The operation was canceled.
|
Pecan GPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5, cuda 11.5.119)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Pecan GPU (centos 7.7, gcc 8.2.0, open-mpi 4.0.1, mkl 2019.5, cuda 11.5.119)
The operation was canceled.
|
Sherlock GPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, cuda 11.5.0, openblas 0.3.10, zlib 1.2.11)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Sherlock GPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, cuda 11.5.0, openblas 0.3.10, zlib 1.2.11)
The operation was canceled.
|
Sherlock CPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, openblas 0.3.10, zlib 1.2.11)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Sherlock CPU (centos 7.9.2009, gcc 10.1.0, open-mpi 4.1.2, openblas 0.3.10, zlib 1.2.11)
The operation was canceled.
|
Ubuntu (20.04, clang 10.0.0 + gcc 9.4.0, open-mpi 4.0.3, cuda-11.8.89)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Ubuntu (20.04, clang 10.0.0 + gcc 9.4.0, open-mpi 4.0.3, cuda-11.8.89)
The operation was canceled.
|
Ubuntu (20.04, gcc 10.3.0, open-mpi 4.0.3) - github codespaces
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Ubuntu (20.04, gcc 10.3.0, open-mpi 4.0.3) - github codespaces
The operation was canceled.
|
Ubuntu (22.04, gcc 11.2.0, open-mpi 4.1.2)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Ubuntu (22.04, gcc 11.2.0, open-mpi 4.1.2)
The operation was canceled.
|
Pangea 2 (centos 7.6, gcc 8.3.0, open-mpi 2.1.5, mkl 2019.3)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Pangea 2 (centos 7.6, gcc 8.3.0, open-mpi 2.1.5, mkl 2019.3)
The operation was canceled.
|
Centos (7.7, gcc 8.3.1, open-mpi 1.10.7, cuda 11.8.89)
Canceling since a higher priority waiting request for 'Docker Build TPLs-refs/pull/254/merge' exists
|
Centos (7.7, gcc 8.3.1, open-mpi 1.10.7, cuda 11.8.89)
The operation was canceled.
|