Skip to content

wip

wip #363

Triggered via push September 15, 2024 10:18
Status Failure
Total duration 50s
Artifacts

check.yaml

on: push
Matrix: check
Fit to window
Zoom out
Zoom in

Annotations

9 errors
check (3.11, 3.11)
Process completed with exit code 1.
check (3.12, 3.12)
The job was canceled because "_3_11_3_11" failed.
check (3.12, 3.12)
Process completed with exit code 1.
check (3.9, 3.9)
The job was canceled because "_3_11_3_11" failed.
check (3.9, 3.9)
Process completed with exit code 1.
check (3.10, 3.10)
The job was canceled because "_3_11_3_11" failed.
check (3.10, 3.10)
Process completed with exit code 1.
check (3.13-dev, 3.13)
The job was canceled because "_3_11_3_11" failed.
check (3.13-dev, 3.13)
The operation was canceled.