Skip to content

Update IS_IN_UNGRID to handle if grid lon defintions are mismatched (… #961

Update IS_IN_UNGRID to handle if grid lon defintions are mismatched (…

Update IS_IN_UNGRID to handle if grid lon defintions are mismatched (… #961

Triggered via push December 13, 2024 20:34
Status Failure
Total duration 56s
Artifacts

gnu.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

16 errors and 3 warnings
build (Ifremer1)
Process completed with exit code 1.
build (OASACM)
Process completed with exit code 1.
build (ite_pdlib)
The job was canceled because "Ifremer1" failed.
build (ite_pdlib)
Process completed with exit code 1.
build (NCEP_st2)
The job was canceled because "Ifremer1" failed.
build (NCEP_st2)
Process completed with exit code 1.
build (NCEP_st4sbs)
The job was canceled because "Ifremer1" failed.
build (NCEP_st4sbs)
Process completed with exit code 1.
build (MULTI_ESMF)
The job was canceled because "Ifremer1" failed.
build (MULTI_ESMF)
The operation was canceled.
build (NCEP_st4)
The job was canceled because "Ifremer1" failed.
build (NCEP_st4)
The operation was canceled.
build (UKMO)
The job was canceled because "Ifremer1" failed.
build (UKMO)
The operation was canceled.
build (NCEP_glwu)
The job was canceled because "Ifremer1" failed.
build (NCEP_glwu)
The operation was canceled.
setup
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (Ifremer1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (OASACM)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636