storage: move encryption out of the CCL #36721
Triggered via pull request
January 24, 2025 19:30
Status
Cancelled
Total duration
16m 42s
Artifacts
–
github-actions-essential-ci.yml
on: pull_request
acceptance
9m 18s
check_generated_code
4m 13s
docker_image_amd64
5m 22s
examples_orms
13m 29s
lint
15m 37s
local_roachtest
15m 35s
local_roachtest_fips
15m 35s
linux_amd64_build
5m 11s
linux_amd64_fips_build
5m 42s
linux_arm64_build
6m 51s
macos_amd64_build
6m 54s
macos_arm64_build
7m 34s
unit_tests
15m 51s
windows_build
6m 41s
Annotations
16 errors
check_generated_code
Run `./dev generate bazel` to fix this error.
|
check_generated_code
Process completed with exit code 1.
|
acceptance
Process completed with exit code 3.
|
local_roachtest_fips
Canceling since a higher priority waiting request for '2025-01-24-encryption-ccl' exists
|
acceptance/many-splits failed
(cluster.go:2368).Start: COMMAND_PROBLEM: exit status 1
|
acceptance/many-splits failed
test artifacts and logs in: /github-actions-runner/_work/cockroach/cockroach/artifacts/acceptance/many-splits/run_1
|
local_roachtest_fips
The operation was canceled.
|
local_roachtest
Canceling since a higher priority waiting request for '2025-01-24-encryption-ccl' exists
|
acceptance/many-splits failed
(cluster.go:2368).Start: COMMAND_PROBLEM: exit status 1
|
acceptance/many-splits failed
test artifacts and logs in: /github-actions-runner/_work/cockroach/cockroach/artifacts/acceptance/many-splits/run_1
|
local_roachtest
The operation was canceled.
|
lint
Canceling since a higher priority waiting request for '2025-01-24-encryption-ccl' exists
|
lint
Process completed with exit code 1.
|
lint
The operation was canceled.
|
unit_tests
Canceling since a higher priority waiting request for '2025-01-24-encryption-ccl' exists
|
unit_tests
The operation was canceled.
|