Skip to content

Merge pull request #6897 from ecamp/renovate/isomorphic-dompurify-2.x #3188

Merge pull request #6897 from ecamp/renovate/isomorphic-dompurify-2.x

Merge pull request #6897 from ecamp/renovate/isomorphic-dompurify-2.x #3188

Triggered via push February 20, 2025 02:38
Status Cancelled
Total duration 5m 59s
Artifacts 5
Continuous integration  /  api-check-needed
4s
Continuous integration / api-check-needed
Continuous integration  /  Tests: Print
49s
Continuous integration / Tests: Print
Continuous integration  /  Tests: PDF
22s
Continuous integration / Tests: PDF
Continuous integration  /  e2e-check-needed
4s
Continuous integration / e2e-check-needed
Continuous integration  /  frontend-check-needed
6s
Continuous integration / frontend-check-needed
Continuous integration  /  Lint: ClientPrint (ESLint)
22s
Continuous integration / Lint: ClientPrint (ESLint)
Continuous integration  /  Lint: Print (ESLint)
24s
Continuous integration / Lint: Print (ESLint)
Continuous integration  /  Tests: API
0s
Continuous integration / Tests: API
Continuous integration  /  Lint: API (php-cs-fixer)
0s
Continuous integration / Lint: API (php-cs-fixer)
Continuous integration  /  ...  /  Tests: End-to-end (build job)
26s
Continuous integration / Tests: End-to-end build / Tests: End-to-end (build job)
Continuous integration  /  Lint: e2e (ESLint)
24s
Continuous integration / Lint: e2e (ESLint)
Continuous integration  /  Tests: Frontend
0s
Continuous integration / Tests: Frontend
Continuous integration  /  Lint: Frontend (ESLint)
0s
Continuous integration / Lint: Frontend (ESLint)
Matrix: Continuous integration / Tests: End-to-end run / Tests: End-to-end
Continuous integration  /  Finish coveralls report
0s
Continuous integration / Finish coveralls report
Continuous integration  /  workflow-success
1s
Continuous integration / workflow-success
Continuous integration  /  Send out CI success event
0s
Continuous integration / Send out CI success event
Build and push docker images  /  Build images and push
Build and push docker images / Build images and push
Upgrade or install deployment  /  Deploy to Kubernetes
Upgrade or install deployment / Deploy to Kubernetes
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 4 warnings
Continuous integration / Tests: End-to-end run / Tests: End-to-end (firefox)
Canceling since a higher priority waiting request for 'CI + CD for devel-push-devel' exists
Continuous integration / workflow-success
Job e2e-tests-run failed with status cancelled
Continuous integration / Lint: ClientPrint (ESLint)
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Continuous integration / Lint: Print (ESLint)
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Continuous integration / Lint: e2e (ESLint)
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists
Continuous integration / Tests: Print
Failed to save: Failed to CreateCacheEntry: Received non-retryable error: Failed request: (409) Conflict: cache entry with the same key, version, and scope already exists

Artifacts

Produced during runtime
Name Size
cypress-output-chromefalse
441 KB
cypress-output-edgefalse
441 KB
cypress-output-firefoxfalse
441 KB
e2e-tests-images
228 MB
ecamp~ecamp3~J1X69Q.dockerbuild
61.3 KB