Skip to content

Remove unused const

Remove unused const #6

Triggered via push October 11, 2024 11:31
Status Cancelled
Total duration 12d 16h 47m 24s
Artifacts

test-docker.yml

on: push
docker (docker/Dockerfile.revad)  /  docker
0s
docker (docker/Dockerfile.revad) / docker
docker (docker/Dockerfile.revad-eos)  /  docker
0s
docker (docker/Dockerfile.revad-eos) / docker
Matrix: docker
Fit to window
Zoom out
Zoom in

Annotations

5 errors
docker (docker/Dockerfile.revad) / docker
The run was canceled.
docker (docker/Dockerfile.revad-eos) / docker
The run was canceled.
docker (docker/Dockerfile.revad-ceph) / docker
The run was canceled.
docker (docker/Dockerfile.reva) / docker
The run was canceled.
docker (docker/Dockerfile.revad-eos) / docker
The run was canceled.