Skip to content

Redesign spark integration to take advantage of resource profiles. #87

Redesign spark integration to take advantage of resource profiles.

Redesign spark integration to take advantage of resource profiles. #87

Triggered via push January 8, 2025 09:13
Status Failure
Total duration 6h 0m 25s
Artifacts

ci.yml

on: push
Matrix: ci-pipeline
Fit to window
Zoom out
Zoom in

Annotations

4 errors
ci-pipeline (3.5.0)
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 360 minutes.
ci-pipeline (3.5.0)
The operation was canceled.
ci-pipeline (3.4.1)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
ci-pipeline (3.4.1)
The operation was canceled.