Skip to content

Merge pull request #430 from tnull/2025-01-fix-potential-fee-rate-con… #1268

Merge pull request #430 from tnull/2025-01-fix-potential-fee-rate-con…

Merge pull request #430 from tnull/2025-01-fix-potential-fee-rate-con… #1268

Triggered via push January 17, 2025 13:13
Status Failure
Total duration 6h 0m 41s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
build (ubuntu-latest, stable)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, stable)
The operation was canceled.
build (ubuntu-latest, 1.75.0)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
build (ubuntu-latest, 1.75.0)
The operation was canceled.
build (macos-latest, stable)
The job was canceled because "ubuntu-latest_stable" failed.
build (macos-latest, stable)
The operation was canceled.
build (ubuntu-latest, beta)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636