Skip to content

V1.8.8 PR

V1.8.8 PR #415

Triggered via pull request December 1, 2024 01:58
Status Failure
Total duration 46s
Artifacts

unit-tests.yml

on: pull_request
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Unit tests (3.8)
Process completed with exit code 1.
Unit tests (3.11)
The job was canceled because "_3_8" failed.
Unit tests (3.11)
The operation was canceled.
Unit tests (3.9)
The job was canceled because "_3_8" failed.
Unit tests (3.9)
The operation was canceled.
Unit tests (3.10)
The job was canceled because "_3_8" failed.
Unit tests (3.10)
The operation was canceled.