Skip to content

Bump docker/build-push-action from 5 to 6 #5

Bump docker/build-push-action from 5 to 6

Bump docker/build-push-action from 5 to 6 #5

Triggered via pull request October 25, 2024 16:05
Status Failure
Total duration 18m 41s
Billable time 19m
Artifacts

lint.yml

on: pull_request
Matrix: golangci-lint
Fit to window
Zoom out
Zoom in

Annotations

5 errors
check
Process completed with exit code 1.
check
Process completed with exit code 126.
check
Process completed with exit code 126.
golangci-lint (Go 1.21.x)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
golangci-lint (Go 1.22.x)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.