Add support for Scheduler#fiber_interrupt
.
#274
Annotations
11 errors and 1 warning
head on ubuntu with URing
The action 'Run tests' has timed out after 5 minutes.
|
3.3 on ubuntu with URing
The job was canceled because "ubuntu_head_URing" failed.
|
3.3 on ubuntu with URing
The operation was canceled.
|
3.3 on ubuntu with EPoll
The job was canceled because "ubuntu_head_URing" failed.
|
3.3 on ubuntu with EPoll
The operation was canceled.
|
3.1 on ubuntu with EPoll
The job was canceled because "ubuntu_head_URing" failed.
|
3.1 on ubuntu with EPoll
The operation was canceled.
|
3.2 on ubuntu with EPoll
The job was canceled because "ubuntu_head_URing" failed.
|
3.2 on ubuntu with EPoll
The operation was canceled.
|
head on ubuntu with URing
The job was canceled because "ubuntu_head_URing" failed.
|
head on ubuntu with URing
The operation was canceled.
|
head on ubuntu with URing
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|