Skip to content

Commit

Permalink
Update embedded video
Browse files Browse the repository at this point in the history
video link changed to enable display of video
[ci skip]
  • Loading branch information
RBernsen authored Oct 12, 2020
1 parent c2db9bd commit ebfb289
Showing 1 changed file with 2 additions and 3 deletions.
5 changes: 2 additions & 3 deletions docs/user-guide/gantt-chart/scheduling/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -45,8 +45,7 @@ Changing to the **manual scheduling mode makes sense if**
- you don't want a parent work package's dates being updated automatically when changing the children's dates, or
- you don't want a follower's start date be automatically updated when you change the predecessor's finish date

<iframe width="560" height="315" src="https://www.youtube.com/watch?v=Me4cMULZKRM" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>

<iframe width="560" height="315" src="https://www.youtube.com/embed/Me4cMULZKRM" frameborder="0" allow="accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>


## Change mode
Expand All @@ -59,4 +58,4 @@ The pin symbol next to the date indicates that a work package is in manual sched

![image-20200929161237109](C:/Users/Matthias Laux/Documents/GitHub/openproject/docs/user-guide/gantt-chart/scheduling/image-20200929161237109.png)

Changing back to automatic scheduling mode works the same way. Please note: When switching from manual scheduling to automatic scheduling some work packages' dates might be updated according to principles [stated above](#automatic-scheduling-mode).
Changing back to automatic scheduling mode works the same way. Please note: When switching from manual scheduling to automatic scheduling some work packages' dates might be updated according to principles [stated above](#automatic-scheduling-mode).

0 comments on commit ebfb289

Please sign in to comment.