Skip to content

Upgrade dependencies #71

Upgrade dependencies

Upgrade dependencies #71

Triggered via pull request May 30, 2024 02:16
Status Failure
Total duration 4m 55s
Artifacts

container-build-push.yaml

on: pull_request
Matrix: build-push
Fit to window
Zoom out
Zoom in

Annotations

1 error and 4 warnings
build-push (linux/amd64)
The SSL connection could not be established, see inner exception.
build-push (linux/amd64)
Failed to download action 'https://api.github.com/repos/sigstore/cosign-installer/tarball/e1523de7571e31dbe865fd2e80c5c7c23ae71eb4'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
build-push (linux/amd64)
Back off 20.485 seconds before retry.
build-push (linux/amd64)
Failed to download action 'https://api.github.com/repos/sigstore/cosign-installer/tarball/e1523de7571e31dbe865fd2e80c5c7c23ae71eb4'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
build-push (linux/amd64)
Back off 22.65 seconds before retry.